The Holding Centre Completed

by | Aug 31, 2017

Uniserve’s new container storage facility, The Holding Centre (THC) – formerly Plateau C – is now complete and ready for operation. The facility will provide container storage for new and existing customers at the Port of Felixstowe.

Spread over five acres, The Holding Centre is ideally located alongside Uniserve’s future Felixstowe development of the ‘Super DC’ (Distribution Centre) on the neighbouring 30 acre site. The building, with a 46,500 sqm footprint, is set to be 40 metres high and will include a bottling operation, general merchandise, chilled and frozen foods, clothing distribution and e-fulfilment operations.

The Holding Centre will be officially opened for business early next month.

 

Photo above: 30 acre Super DC site situated next to The Holding Centre.

For any enquiries or shipment specific information, please don’t hesitate to email info@ugroup.co.uk or call 01708 259400 to speak to our customer service or operational teams for any clarification or support.

More News…..

Supply Chain Visibility with a Connected Digital Experience

Supply Chain Visibility with a Connected Digital Experience

A Simpler Way to Stay in Control of Supply Chain Managing global freight can often feel fragmented. Shipment updates arrive from different sources, documents sit in multiple systems, and reporting takes time to assemble. Teams spend too much effort chasing information...

Case study: Keeping Rail Supply Chains on Track

Case study: Keeping Rail Supply Chains on Track

A major rail operator needed a logistics partner capable of managing a diverse inventory of engineering components, spare parts and operational assets across its maintenance network. With growing demands for asset availability, traceability and operational efficiency,...